Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\functions.php on line 6114
Warisan Merdeka Mall, Kuala Lumpur – BIMASIA Sdn Bhd

Sultan Ibrahim Power Plant, Johor​

Client
GDP Architects for PNB Merdeka Ventures

Description
Production of Tenancy drawings for the eight-storey Warisan Merdeka Mall part of the integrated Merdeka 118 development comprising the Merdeka PNB 118 Tower, the Park Hyatt Hotel, and an observation deck.

Scopes & Innovations
Information Gathering
BIM Model assessment, cleanup and breakdown
LOD 300 BIM Modelling (Architecture, Structure & MEP)
BIM 4D Simulations
Value creations

Status
Construction Stage