Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\functions.php on line 6114
PETRONAS TGAST Kerteh – BIMASIA Sdn Bhd

Sultan Ibrahim Power Plant, Johor​

Client
PETRONAS (PRSB)

Description
Proof of Value to demonstrate how BIM can be used for a completed PETRONAS Terengganu Gas Terminal and to showcase value creations to PETRONAS as the Owner and Operator for Asset Management. B-ALIMS, a BIM customized integrated system where the as-built 3D model is linked to various systems such as Enterprise Resource Planning, Turnaround Management System and Risk Management System was created as a centralized and integrated live data feed to provide visibility used for Operation & Maintenance and Turnaround activities.

Scopes & Innovations
Information Gathering and Technical Workshops
LOD 500 BIM Modelling (Architecture, Structure & MEP)
BIM 4D, 5D, 6D and 7D Simulations
BIM Customized System links with various existing systems
Improvements, Value creations and Value propositions
Implementation Strategy and Business Model

Status
Completed 2019