Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\post-template.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\rest-api\endpoints\class-wp-rest-terms-controller.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Uninitialized string offset: 0 in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\style-engine\class-wp-style-engine.php on line 1

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\Domains\bimasiac\bimasia.com.my\wwwroot\wp-includes\functions.php on line 6114
Pan Borneo Highway Sarawak, Phase 1 – BIMASIA Sdn Bhd

Sultan Ibrahim Power Plant, Johor​

Client
UTSB for Lebuhraya Borneo Utara Sdn Bhd

Description
Development and upgrading of Pan Borneo Highway Sarawak (Phase 1), 786km utilizing BIM, GIS and UAV systems to manage and monitor all the WPC road packages, to mitigate risk, track the progress of work and to build up a centralized data system for Operation & Maintenance purposes. The first BIM Highway project utilizing GIS and UAV in the world

Scopes & Innovations
BIM Execution Plan
Lead BIM Coordinator (pre-construction, construction & as-built) LOD 300/400/500 BIM Management and Modelling
Civil & Structure / Utilities / Architecture
Benchmark BIM highway project for Ministry of Works Malaysia
Awarded the ‘Public Services Construction Application Award” in the 4th International BIM Awards Conference, Hong Kong in 2018

Status
Construction Stage