Client
Sunway Construction Group Berhad
Description
The MRT Putrajaya Line (previously known as the Sungai Buloh-Serdang-Putrajaya Line) includes a 13.5km underground section featuring 11 stations with world-class facilities and amenities. These stations are located at the very heart of the Kuala Lumpur city centre and are geared towards improving chronic traffic congestion in the region. The underground portion of the alignment stretches from Sentul through Titiwangsa, to Hospital Kuala Lumpur, Ampang Park and KLCC before ending up in Chan Sow Lin.
Responsible to update LOD 500 BIM models (MEP) using BIM Authoring tool, Autodesk Revit based on latest revision (Mark up As-built drawing & Lidar Scanning), to combine Architecture, Structure, System, & MEP LOD 500 BIM Models and production of As-Built LOD 500 Combine Services Drawing complete with tagging for Chan Sow Lin Station and Sentul West Station.
Scopes & Innovations
To update and amendment of all MEP BIM model including with System model
Update MEP BIM Model as per As-Built Lidar scanning
Production of LOD500 Combined Services drawings with tagging
Status
Completed 2023