PROJECTS

Chennai Metro Railway Phase 2, India

Chennai Metro Railway Phase 2, India

Client
MMSB Consult

Description
BIM Production services for the Preliminary Design stage for the Chennai Metro Railway Phase 2 Corridor 5 (P2C05/06). The phase 2 comprises of three corridors. Corridor 3 from Madhavaram to SIPCOT, Corridor 4 from Lighthouse to Poonamallee and Corridor 5 from Madhavaram to Sholinganallur. It passes through areas like Purasawalkam, Sterling Road and Mylapore.

Scopes & Innovations
Information Gathering
Video Animation
Preliminary LOD 200 BIM Modelling (Structure & MEP)
Production of 2D Drawings from 3D model

Status
Preliminary Design Stage