Chennai Metro Railway Phase 2, India

Client
MMSB Consult

Description
BIM Production services for the Preliminary Design stage for the Chennai Metro Railway Phase 2 Corridor 5 (P2C05/06). The phase 2 comprises of three corridors. Corridor 3 from Madhavaram to SIPCOT, Corridor 4 from Lighthouse to Poonamallee and Corridor 5 from Madhavaram to Sholinganallur. It passes through areas like Purasawalkam, Sterling Road and Mylapore.

Scopes & Innovations
Information Gathering
Video Animation
Preliminary LOD 200 BIM Modelling (Structure & MEP)
Production of 2D Drawings from 3D model

Status
Preliminary Design Stage