Client
TSR Bina
Description
The Master infrastructure project in Malaysia that utilize BIM up to as-built level. Kwasa Land has mandated that Building Information Modelling to be integral to Kwasa Land Infrastructure Project.
Scopes & Innovations
BIM Execution Plan
Lead BIM Coordinator (pre-construction,construction & as-built)
4D Simulation & LOD 300/400/500 BIM Modelling
Civil & Structure / Utilities
Completion 6 months ahead of programme
Status
Construction Stage